Skip to content
LisBonFARM

Conceptual rendering

Investors

Capital for a specification-grade infrastructure asset.

LISBONFARM LTD is preparing an equity raise of up to US$20 million in primary capital for an integrated Phase 1 and planned Phase 2 investment case. Valuation and ownership are addressed privately through a controlled investor process.

The opportunity

What you invest in, and where your capital sits.

Capital is raised at project-company level for a single, defined asset. Equity funds development and build-out alongside senior project debt, with drawdown aligned to the phased commissioning of processing lines.

Indicative summary

US$20M

Issuer
LISBONFARM LTD (Nigeria, RC 8508608)
Asset
AgroGlobal Integrated Cassava Processing Infrastructure, Edo State
Instrument
Primary equity
Size
Up to US$20 million
Scope
Integrated Phase 1 and planned Phase 2 investment case
Complementary capital
Senior project debt at financial close
Process
Controlled, under confidentiality agreement

Indicative only. Not an offer. Planned Phase 2 remains subject to engineering, funding, land, market, permitting, governance and execution completion.

Investment thesis

Six reasons this asset stands apart.

01

A structural supply gap

Nigerian manufacturers rely on imported maize starch while the country grows the world's largest cassava crop. Local, specification-grade supply competes on landed cost, lead time and currency exposure.

02

Feedstock depth

At full Phase 1 capacity the plant needs less than 1% of national cassava output, sourced through a diversified outgrower, aggregator and nucleus model.

03

De-risked, modular build

Three identical 400 TPD lines. Capital is deployed in step with demonstrated performance rather than committed to full capacity on day one.

04

Specification-grade product

A published food-grade specification positions output for institutional buyers in food, beverage, pharmaceutical and industrial markets.

05

Embedded upside

A value ladder from native starch to modified starch, then glucose and sorbitol, on the same feedstock and utility base.

06

Platform, not a single plant

AgroGlobal ICPI is designed as the reference template for a replicable portfolio, backed by a group with in-house engineering and technology capability.

Structure & protections

Structured along institutional project-finance lines.

The transaction is being structured with the protections capital providers expect of infrastructure assets. Final terms are set out in definitive documentation.

Ring-fenced perimeter

Capital is committed to a defined project company and asset. Related group entities sit outside the transaction perimeter.

Asset-backed security

Project assets, land lease, material contracts and project accounts secured in favour of lenders, under a controlled accounts waterfall.

Equity governance

Board representation, reserved matters and information rights for equity investors, set out in definitive documentation.

Independent oversight

Independent engineer and technical adviser review of design, construction and commissioning milestones.

E&S standards

Environmental and social management aligned with IFC Performance Standards and the EDFI Exclusion List.

Transparent reporting

Regular construction, operating and financial reporting to capital providers from financial close.

Process

Request the Information Memorandum.

  1. 1

    Request

    Submit the form below or write to the investor relations team.

  2. 2

    Confidentiality

    We issue a confidentiality agreement for execution.

  3. 3

    Information Memorandum

    Full investment case, financial model and data room access.

  4. 4

    Engagement

    Management meetings, site visit and term sheet discussions.

Investor relations

investment@lisbonfarm.com

Founder & CEO

Alpha Lucky Chukwunwike Okechukwu

alpha@lisbonplatforms.com

Prefer email? Write to investment@lisbonfarm.com.

This page does not constitute an offer or solicitation. Any opportunity is available only to institutional, professional or qualified investors under definitive documentation. Important notice.